Substation Container Coating

Coating refurbishment of a substation container in Great Yarmouth, with all rusted areas stripped back to bare steel before applying a Tikkurila anti-corrosive primer and durable polyurethane topcoat.

Completed substation container coating in Great Yarmouth.
Sector
Energy / utilities
Service
Industrial coatings
Preparation
2900 psi wash, rust removed
Coating system
Tikkurila RM40 + Temadur 50

Project overview

A substation container at a Great Yarmouth facility required a full external coating refurbishment. Years of coastal exposure had left the metal cladding and framework corroded and unsound, so the scope was to strip the rusted areas back to bare steel and rebuild a protective coating system capable of withstanding the harsh marine environment.

The challenge

The container was situated in a live utility environment where downtime was not an option. Corrosion was widespread across panels, flashings and structural steel, and the existing coating had failed to the point that simple overcoating would not have provided a lasting repair. Access was also restricted around the unit, with uneven ground and live equipment nearby.

Site constraints

  • Live substation environment with no allowance for shutdown
  • Coastal exposure accelerating corrosion on external metalwork
  • Restricted access around the container and adjacent equipment
  • Removal of all rust and failed coating in affected areas before recoating

Our approach

Access was provided by a combination of MEWP and step ladders, allowing operatives to reach every face and roof edge safely without disturbing adjacent equipment. Surfaces were masked and protected, then coated with Tikkurila RM40 anti-corrosive primer followed by Tikkurila Temadur 50 polyurethane topcoat, applied to the manufacturer’s specified film build for long-term protection.

Preparation and delivery

All external metal surfaces were washed down using a 2900 psi pressure washer to remove loose coating, salt deposits and surface corrosion. Areas that still held rust or failed paint were prepared by hand and power tool back to sound, bare steel - only the affected areas were taken back, with sound coating left in place as a base. The substrate was inspected as work progressed to ensure no contaminated or unsound metal remained before coating began.

System

Tikkurila RM40 anti-corrosive primer was used to seal the prepared steel and provide a sound base for the topcoat. Tikkurila Temadur 50, a durable polyurethane finish, was applied as the topcoat to give UV stability, colour retention and resistance to the coastal atmosphere.

Before and after

Corroded container cladding before pressure washing and preparation.
The same container after coating with Tikkurila RM40 and Temadur 50.

Project gallery

Container elevation before preparation.
Corroded cladding detail before washing.
Surface corrosion on the container framework.
Prepared metal ready for primer application.
Coating application in progress on the container side.
Primer being applied to the prepared steel.
Detail of coating build during the works.
Finished container elevation after topcoat.
Completed coating system on the container.
Wide view of the refurbished substation container.

Result

The container was returned to service with a uniform, fully protected coating finish. All rusted areas were taken back to bare steel and rebuilt with a two-coat protective system, and the work was completed without disruption to the substation operations. The finish was left ready to withstand continued coastal exposure.

Related services

Discuss Your Site Requirements

Send us a brief description and photographs of the issue. We can review the information and arrange a site visit where required.

Based near Eye in Suffolk, J&L Maintenance supports commercial and industrial sites UK wide.

info@jandlmaintenance.co.uk

Contact details

Address
J&L Warehouse, Church Farm, Hoxne Road, Eye, Suffolk, IP23 7NJ
Response
Enquiries answered within one working day