Project overview

Ipswich Town Football Club asked J&L Maintenance to prepare and recoat the perimeter handrails and associated metalwork at all four lower stands, including the access platforms and steps. The existing coating was worn and chipped from years of use. Work ran on a day rate, stand by stand, across daytime, evening and weekend shifts, timed to finish before the new season's opening fixture.

The challenge

The metalwork was in normal worn condition, chipped and degraded from general use. The stands are part of a live, occupied stadium, and work was restricted to non-matchday, non-event days with the stands closed to spectators, players and the public while each section was in progress. The programme had to fit around the fixture calendar with a hard deadline before the first match of the season.

Site constraints

  • Live stadium - many contractors on site
  • Non-matchday and non-event access only
  • Deadline set by the season's opening fixture

Our approach

Each of the four lower stands was worked in turn, using the stadium's own platforms and fixed steps as the place of work, with podium steps and hop-ups brought in only for the highest handrail sections. Each stand was checked, cleaned down and handed back to the club at the end of the shift. To meet the deadline before the season opener, the team worked days and evenings, fitting around other time-restricted work also being finished on site before matchday.

Preparation and delivery

Surfaces were prepared by hand with scrapers, abrasive pads and wire brushes, moving to powered sanders and wire brushes only where hand tools weren't enough to get back to a sound, clean, keyed surface. Seating, treads, nosings and surrounding finishes were sheeted off below and around each work section throughout.

System

Prepared steel was primed with Tikkurila RM40, brush and roller applied, followed by a Temadur 50 topcoat, also brush and roller applied, chosen to stand up to heavy handling and footfall through a season.

Before and after

Before: Pitchside Metalwork (Gates and Handrails)
After: Pitchside Metalwork (Gates and Handrails)

Project gallery

Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)
Pitchside Metalwork (Gates and Handrails)

Result

All four lower stands had their perimeter handrails and metalwork stripped back, primed and topcoated in time for the season's opening match, with each stand cleaned down, and handed back to the club section by section as work progressed.

Related services

Discuss Your Site Requirements

Send us a brief description and photographs of the issue. We can review the information and arrange a site visit where required.

Based near Eye in Suffolk, J&L Maintenance supports commercial and industrial sites UK wide.

info@jandlmaintenance.co.uk

Contact details

Address
J&L Warehouse, Church Farm, Hoxne Road, Eye, Suffolk, IP23 7NJ
Response
Enquiries answered within one working day